ShuDudu's Home was started in 2011, but the web data is lost, so now begin again, I would like to make some friends, I hope you like ShuDudu's home.
Current position: ShuDudu > Life >

Argentina apply some experience in electricity

Thursday on February 20th, 2020Life

In the Argentine capital buenos aires, power stations have Edenor, Edesur, Edelap, more common is Edenor and Edesur two power stations.

Generally people who shop here, most of the rent to store already has electricity, rent a store if there is no electricity, it is in trouble, need to apply for electricity, much to spend thousands of dollars, required before applying power prepare the following materials (remember before had written an article: Argentine commercial application store electricity necessary for procedure)

ALTA SUMINISTRO - NUEVO USARIO - COMERCIO

- CONTRATO DE LOCACION - rental contracts

- CUIT - cuit No.

-ORIGINAL DNI - the identity of the original red book

-HABILITACION MUNICIPAL O CONSTANCIA EN CURSO - Business License

-CERTIFICADO ELECTRICISTA MATRICULADO (APSE) - also known as DCI, this is too much trouble!

-DEPOSITO EN GARANTIA $ 290 - Deposit application

Before applying power must be clear, what type of store for you to use, if the application is wrong, followed by upgrades and downgrades have trouble, the biggest trouble is that you submit proof DCI or the rewiring, etc., so be sure to figure out here to give you a brief introduction of electric type of application, I am not a professional electrician, just to tell you what I know:

monofacico: so-called two-phase, off the road, the store will no electricity, all the lines from the wall to go inside, so it's best to do is just beginning, or after application to give the wall holes, discharge table boxes and T1 are different, but it must be clinker box.

T1 (trifacico) a so-called three-phase power, off the road, and can store half of the electrical line can go from the wall, but the line must be protected with an insulating case, the discharge table box is larger than monofacico some specialized requirements, but also to the clinker box, usually supermarkets are using these.

T2 for more advanced, is not very clear, relatively high, apply too much trouble, prices are more expensive, the box must be stricter than the discharge table above two requirements should be all okay than the above.

I only know the above three types, more common.

The most troublesome is applying electric DCI prove this, so do not store decoration electricity when we must make regular electrician, the lines are arranged in a regular press OK, if some of your hair electrician, they do not by formal arrangements that time no way DCI get the certification, it would have to rearrange electricity, cable DCI prove to have certain requirements, the formal electrician is generally known, the electrical layout will probably take at least 1000-5000, it also depends on how big your place, DCI proven 90 square to 950 in this way, it also depends on where and how much electricity a few watts, so large but also to 2000.

In addition to these places should pay attention to, but that if there is no real grasp, do not believe some people familiar with the plant, can be installed directly on the meter, because a lot of people out there deceived, others have installed meters are useless or the old power station can not charge the meter for statistical, or the meter is no invoice, of course, does not rule out some people are more familiar with the power plant, they do long-term electricity on the outside, but also experience more familiar with, you can bypass the test and apply to the meter, but meter plant must be people to take over, or they may also deceived, after this analysis, we should probably clear to see where you might let you avoid detours.

In addition, in Argentina, if there is no electricity, electricity can not just borrow a neighbor, even if neighbors agree that when you station also is electricity theft, fines do not know, so in case of no electricity, if long-term power outage, the best buy generators, manual generator in 2000, 3.4 kW to 7 kilowatts, or the even smaller type, with a motor-generator, the same 3.4 kW to 7 kilowatts, a little bigger than a manual, the price is twice as high, 4500 case.

Of course, if you want to power things you know or contracted electrician is safer to do, that's good, of course, spend a little money, bid Well, many tens of thousands, thousands of small, so I write these things are useful to you, at least you know what price.

Copyright Protection: ShuDudu from the original article, reproduced Please keep the link: https://www.shududu.com/life/Argentina-apply-some-experience-in-electricity.htm